Brigade Combat Team 1st Complex, Phase I
project details
project type
Design/Build
location
Fort Drum, NY
contract value
$29,061,400.00
project description
The project involved the design and construction of three (3) Company Operations Facilities, consisting of:
- a 28,926 sf 2-Company Facility
- a 42,532 sf 3-Company Facility
- a 86,009 sf 6-Company Facility
These facilities provide new company operations facilities for a total of 1700 troops and includes administration spaces, readiness/gear storage rooms with TA 50 lockers, secure equipment storage areas, arms vaults and miscellaneous support facilities. Anti-terrorism/force protection measures were incorporated into the building design providing resistance to progressive building collapse and blast resistance of the building windows and doors.
The building design consisted of reinforced concrete perimeter wall foundations and a pre-engineered metal building structural frame for all buildings. The exterior building façade was a combination of masonry and insulated metal wall panels. Roofing systems included EPDM membrane at flat roofs and standing seam metal roofing at sloped roofs.